Terminal 103


Terminal 103 is a state of the art facility, opened in 2003. The closeness to a short stay area available for drop off and pick up....

Find out more

Terminal 123


The Terminal 123 is a single-storey facility of 5.000 square meters opened in 1999 and used to serve ferry traffic until 2013. After the relocation of the....

Find out more

Terminal 109-110


Thanks to its dimension of 14.000 square meters divided on two floors, Terminal 109/110 is the widest cruise facility of the Mediterranean with a standard - never....

Find out more

Terminal 117


The Terminal 117 is a single-storey facility restored and opened in 2006. The proximity of the car park 1 and the car park 3 as....

Find out more

Terminal 107-108


The Terminal 107/108 is a two-story facility restored at the end of 90s. Easy access to the Terminal 107/108 is granted by the closeness of a short stay area available....

Find out more

Terminal Isonzo 1-2


Terminal Isonzo is a two-story building, divided in two parts: Isonzo 1 and Isonzo 2, opened respectively in 2009 and 2011. Designed for providing all....

Find out more

Terminal San Basilio 22


St. Basilio Terminal, a single storey ground floor facility built at the end of 80s and renovated in the 90s, provides assistance not only to....

Find out more
mappa immagine

Access On Board

Request luggages service

GENERAL TARIFF

2023_02_28_Parcheggi-2023_UK.pdf
Tariffa-Generale-2019_UK.pdf

GUIDE BOOK